Design  and supply  of a 1.8 km 8” welded steel buried pipeline from Obangue Central to Obangue East CPF.

 Work in joint with Incat  Includes:

  • Pipe welding and Coating
  • Fabrication and Installation of Block Valves
  • Block Valve Assemblies
  • Tie-Ins and River Crossing