Design and supply of a 1.8 km 8” welded steel buried pipeline from Obangue Central to Obangue East CPF.
Work in joint with Incat Includes:
- Pipe welding and Coating
- Fabrication and Installation of Block Valves
- Block Valve Assemblies
- Tie-Ins and River Crossing